Cooling tower packing manufacturers guide: to carry out cooperation in the development of environmentally friendly bamboo grill leaching filler and bamboo water dispenser. Can be widely used in thermoelectric natural ventilation cooling towers and chemical, metallurgical and other industrial industries countercurrent cooling tower, can also be used for scrubbing tower, biochemical tower, scrubber, gas tower and other types of cooling towers.
width 380mm bac counter flow cooling tower pvc fill
1. Bamboo grill leaching filler with long life (up to 16 - 20 years) and other advantages, uniform water density, cooling effect is good, and always remain stable. High strength, easy to damage, do not fall, and one-time production, life without overhaul maintenance.
2. The surface of the bamboo itself has a layer of natural smooth hard protective layer, anti-acid and alkali, corrosion resistance, no scaling, no clogging, no aging, no deformation, high temperature.
bac Cooling tower PVC sheet filler for thermoforming
3. Bamboo grille pouring duct ventilation, good ventilation, low resistance, high strength, tensile load bearing capacity, the bottom of the cooling tower without any support bracket, reduce the project cost.
Bamboo grill leaching filler and PVC plastic pouring filler and cement grid packing comparison concluded that: PVC plastic pouring filler in the production run for 2 years and bamboo grill leaching filler cooling effect up and down, are More than two years after the operation, PVC plastic leaching filler itself appears to be exposed to the defects, due to the gap is small, the accumulation of fouling, the formation of local blockage, resulting in poor water, and some large water column, Resulting in cooling effect is not ideal.
1230*1000mm Mesan cooling tower film fill
Especially the aging deformation of the fragmentation damage is more serious, and fall off the plastic debris often into the condenser cooling pipe, prone to clogging, more serious is the winter leaching filler in the ice skirt local collapse after collapse, the formation of air short circuit , A direct impact on the normal operation of the unit
plastic cooling pad for poultry farm
For more information, please visit our website: www.coolingtowerfiller.com, or contact us with E-mail, our E-mail address is ann@longtimefrp.com, you can also chat us straightly on whatsapp: 008618330029204, you can also call our boss straightly: 008615930159213
没有评论:
发表评论