width 380mm bac counter flow cooling tower pvc fill
Cooling tower packing replacement steps are as follows:
1, the construction of the scene before the other equipment to protect, isolation, listing; on the floor of the waterproof layer laying construction materials to prevent damage.
2, the old cooling tower packing removal, the need to turn off the motor power, remove the cooling tower packing parts pull, remove the old packing, tower garbage clean up, clean up the scene.
750 x 2000mm Kuken cooling tower pp filling
3, the cooling tower packing, due to the larger amount of filler, to ensure that the filler in the adhesive during the curing of sufficient space placed in the bonding process in the same point of contact with the filler to ensure that the crimping process In the filler contact force evenly and tightly.
4, clean up the cooling tower on the internal components of the dust on the garbage, the packing stamp in turn put the cooling tower, in the process of laying the code is strictly prohibited trampling and vigorously squeeze the packing to ensure that each stack of packing blocks neatly, tightly packed in each layer of packing Corner, column weeks tightly seamless, restore the cooling tower packing parts tendons.
cross flow cooling tower spare part fill media
5, the installation should pay attention to the assembly block up and down the direction of each layer must be laid on top of the formation, the layers to be cleaned, no debris blocked.
6, installation, maintenance and other work need to work on the filler, the plate must be above the operation, is strictly prohibited stampede.
7, in the construction, assembly, installation process, is strictly prohibited in the cooling tower packing above the welding operations, if necessary, should take fire prevention measures. After installation, bring out all the construction tools and auxiliary installation facilities in the cooling tower to complete the construction plan, the entire cooling tower packing replacement steps to complete.
cooling tower pvc filling
For more information, please visit our website: www.coolingtowerfiller.com, or contact us with E-mail, our E-mail address is ann@longtimefrp.com, you can also chat us straightly on whatsapp: 008618330029204, you can also call our boss straightly: 008615930159213
订阅:
博文评论 (Atom)
closed type cooling tower
new 1000*1300mm spindle cooling tower pvc fill pack Cooling Tower has roots inside the cooling tower industry that span again greater t...
-
new type Marley cooling tower pvc filler For the reason that cylinder chamber is open to the discharge manifold, no refrigerant gasoline c...
-
750 x 2000mm Kuken cooling tower pp filling Cooling towers are heat rejection devices. They are integral to many refrigeration programs in...
没有评论:
发表评论