Use of honeycomb oblique tube filler

Today I want to introduce the use of honeycomb inclined tube fill method:
1, the bottom of the sedimentation tank to install the mud
Inclined tube sedimentation tank installation order generally from the bottom, the first to complete the bottom of the mud pipe system installation, to ensure that the mud pipe openings meet the design requirements, fixed and reliable, check correct, before allowing the next installation process.
2, complete the filler bracket installation
According to the inclined pipe sedimentation tank filling bracket installation construction plan, the first filler bracket installed in place, check all the welding joints solid, the stent strength enough to bear the weight of the filler, and in the stent surface to complete the anti-corrosion treatment;
3, complete the inclined pipe filler hot
Each of the diagonal pipe packing is packed as a separate hot-dip unit, one unit is finished with 1m2, and then it is stacked on the site (with a small amount of spare parts).
4, inclined tube packing pool assembly
The filler unit after hot bonding is assembled from left to right in the upper part of the packing support. To maintain the 60 ° angle (can be customized) the same, each unit in order to properly fit the assembly, the assembly to the right of the right if the size is not properly fit, according to the size of the loose tube with a loose tube filler after assembly All in place.
5, inclined tube filler fixed
As the inclined pipe filler specific gravity of 0.92 slightly less than water, inclined pipe packing in the pool after the assembly in the need to fill the top of the filler from the left to the right direction of 10mm round steel reinforcement (each unit filler above the two round bar required) , Round bar at both ends of the pool in the sedimentation tank on the wall of the fixed, the installation of round steel can be a good way to prevent the inclined pipe filler in the initial use may occur when the loose floating phenomenon, round steel using epoxy coal asphalt corrosion.
6, inclined tube sedimentation tank operation debugging
(1), check the water is uniform, shall not impact on the sedimentation tank, affecting the precipitation effect;
(2), adjust the water and weir level and the level to the appropriate, to keep the water even;
(3), after the above construction process, so the inclined tube sedimentation tank packing installation has been completed. After normal use, it is necessary to determine the sludge discharge period according to the concentration of the suspended matter in the influent, and pay attention to the sludge in time to ensure that the inclined pipe settling tank always maintain a good running condition and satisfactory water quality.
For more information, please visit our website: www.coolingtowerfiller.com, or contact us with E-mail, our E-mail address is rask@coolingtowerfiller.com, you can also chat us straightly on whatsapp: 008618330029204