Cooling tower filler installation replacement 1 leaching filler should be based on design, installation requirements for assembly. The length of the design of the film is generally divided into 1.0,1.25,1.5,2.0 M four specifications for different engineering design selection. Taking into account the convenience of installation and maintenance, each unit assembly block volume should not exceed 0.5M3.
   2 leaching filler with adhesive assembly, should be carried out on a flat surface, the site of the ambient temperature shall not be less than 5 ℃. After the installation of a group must be immediately flat steel plate to prevent the molding of the sheet itself from the warping off, in the adhesive dry and consolidated before the location can be placed on the flat surface, stacking height should not exceed 2M. To prevent long-term exposure.
   3 should be based on the layout of the tower plane, there are plans to cut small pieces of filler filled with irregular voids. Assembly blocks should be squeezed between. Fill and tower wall, shaft, column beam should also be squeezed between the maximum gap should not exceed 20MM.
   4 Tianjin cooling tower packing installation should pay attention to the assembly block up and down direction, the top of each layer to lay flat, the layers to be clean, no clogging.
   5 installation, maintenance and other work need to work on the filler, you must shop on the flat, is strictly prohibited stampede.
   6 in the construction, assembly, installation process, is strictly prohibited in the filler above the welding operations, if necessary, should take fire prevention measures.
   7 cooling tower packing installation should be assigned to person responsible, closely organized, at any time to check to ensure the quality of installation.
For more information, please visit our website: www.coolingtowerfiller.com, or contact us with E-mail, our E-mail address is rask@coolingtowerfiller.com, you can also chat us straightly on whatsapp: 008618330029204

没有评论:

发表评论

closed type cooling tower

new 1000*1300mm spindle cooling tower pvc fill pack Cooling Tower has roots inside the cooling tower industry that span again greater t...