2017年8月7日星期一

Cooling tower packing - countercurrent cooling tower packing standard angle

Cooling tower filler  - countercurrent cooling tower filler standard angle
Cooling tower in the industrial production as the main core of circulating water heat, in China's industrial production in the impact of China's industrial production costs and efficiency. Cooling tower in the industrial production inappropriate use, it will cause the equipment is not timely cooling, production stagnation, the water temperature is too high and so on. Cooling tower packing is the main factor to promote hydrothermal cycle, therefore, to choose ** cooling tower packing.
Counter - current cooling tower packing standard angle
1. In the construction of counter-current cooling tower, the top of the filler and the air flow into the angle should be controlled within 90 degrees, the use of flat roof, under the diversion ring, the collector and the air flow into the corner control in the 90-120 Between degrees.
2. Shrinkage of the top of the tower, the contraction of the cover of the top angle should be controlled between 90-110 degrees.
3. Water filler inclination control between 5-8 degrees.
4. In the course of the use, in order to prevent the air and the bottom of the filler to the surface of the short circuit, should be set aside the flow of spare measures.
How to clean the cooling tower packing cleaning method
(1): manual cleaning of the cooling tower falling off the dirt residue; with high pressure water gun repeatedly rinse the filler, remove the sludge sludge under the cleaning, etc .; with about 50 ℃ hot water TNB safety ** detergent dissolved with a rinse pump (If the filler is used for a long period of time, causing aging and collapse, it is recommended to replace the filler), while adding sterilization algae, ** to kill biological algae and bacteria; to confirm the system all clean, The recovery of the system, replenishment can be used; all recovered, please Party A management personnel acceptance; evacuation of B items, cleaning the scene of health;
Cooling tower filler cleaning method
(2): 1, temporary use of plastic cloth to build a large pool; 2, the cleaning agent added to the water; 3, the filler removed from the cooling tower into the pot soak; 4, soaked in clean water with water Rinse off the cooling tower; 5, with a sticky agent on the cloth in the cooling tower sink, the sink mouth soaked dredge; 6, with the same method will be cooling tower chassis scale clean; 7, with water Rinse the packing and inside and outside the tower; 8, restore the system everywhere, replenishment can be used; 9, duration: according to the actual situation.
For more information, please visit our website: www.coolingtowerfiller.com, or contact us with E-mail, our E-mail address is rask@coolingtowerfiller.com, you can also chat us straightly on whatsapp: 008618330029204

没有评论:

发表评论

closed type cooling tower

new 1000*1300mm spindle cooling tower pvc fill pack Cooling Tower has roots inside the cooling tower industry that span again greater t...