1, temporary use of plastic cloth to build a large pool;
2, the cleaning agent added to the water;
3, the filler removed from the cooling tower into the pot soak;
4, will be soaked in clean water filled with water rinse back to the cooling tower;
5, with a sticky cloth placed in the cooling tower on the sink, the sink mouth soaked to clear;
6, with the same method to clean the cooling tower chassis scale clean;
7, with water rinse filler and inside and outside the tower;
8, restore the system everywhere, replenishment can be used;
9, duration: according to the actual situation set.